Water well drilling rigs are mainly used for the development of groundwater resources, including domestic, agricultural and industrial water, and are also suitable for hydrogeological exploration, construction engineering, bridge foundation drilling, etc.
Water well drilling rigs have strict specifications in activities such as transfer, transportation, assembly, disassembly, and machine maintenance. These safety procedures should be strictly observed to prevent water well drilling rigs from malfunctioning;
Water well drilling rigs should keep the center of gravity balanced according to the road conditions, etc. The construction site is prohibited from drilling randomly. The backfill pits must be marked.
The inclined section needs to adjust the rig mast lifting angle, tilt left and right, and turn on the car to adjust the center of gravity of the rig; when water accumulates in the access road or construction site, the drill can be used to guide the machine;
Water well drilling rigs need to be cooled before operation to avoid personnel caused by high temperatures. The hydraulic system of the rig needs to be maintained after pressure relief to avoid danger caused by the internal high pressure.
Water well drilling rigs need to be cooled before operation to avoid personnel caused by high temperature. The hydraulic system of the rig needs to be maintained after pressure relief to avoid danger caused by the internal high pressure. When disassembling the main roll of the rig, it is strictly forbidden to carry out main roll maintenance. When connecting the non-rotating anti-rotation steel wire rope to the lifter, pay attention to the rotation of the machine; when the inflexible rotation of the rig lifter causes the live steel wire rope to turn the rope and twist the rope, avoid personnel being pinched.